Home
Products and Services
Case History
Centrifuge
Cyclone Dewatering
Dredge Stacking
Gravel Pit
Screen Dewatering
Pitt and Quarry Ad
Case History
Centrifuge
Cyclone Dewatering
Dewatering
Dredge Stacking
Gravel Pit
Home
Pitt and Quarry Ad
Products and Services
Home
Products and Services
Case History
Centrifuge
Cyclone Dewatering
Dredge Stacking
Gravel Pit
Screen Dewatering
Pitt and Quarry Ad
Case History
Centrifuge
Cyclone Dewatering
Dewatering
Dredge Stacking
Gravel Pit
Home
Pitt and Quarry Ad
Products and Services
Case History
All
Centrifuge
Cyclone Dewatering
Dewatering
Dredge Stacking
Gravel Pit
sss
Cone Bottom Tank
February 18, 2014
0
Cake solids from both units on dual polymer program -Sludge at top left of photo treated only with anionic polymer
February 9, 2014
0
Both units treated with anionic polymer and SPC-929 DS polymer
February 6, 2014
0
Discharge water on left treated with anionic polymer and SPC-929 DS @ 0.5 lbs/dry ton dosage. Discharge water on right treated only with anionic polymer.
February 5, 2014
0
Stacked material-reaching over 70% solids during daily run-due to pressure exerted by the height of the pile
February 4, 2014
0
Solids easily transported via conveyor to stack
February 4, 2014
0
Dewatering screen with 2ml panels. material dewatered from 35% to over 50% on screen
February 4, 2014
0
Chunky material from cone bottom after treatment with SPC-929 dewatering polymer-note the granular nature of the -200 mesh solids
February 4, 2014
0
Close up view of the mud formed by the revolutionary SPC-929 DS
February 4, 2014
0
Clean water off the top of the cone bottom tank, blended with the water sheeting off the slurry mud stack
February 4, 2014
0
Second view of the mud stacking from the tank
February 4, 2014
0
Stacking 40% mud from cone bottom with both anionic polymer and SPC-929 DS cationic polymer-dual dosage of 0.5lbs/dry ton. Note water sheeting off the pile
February 4, 2014
0
10,000 gallon cone bottom tank with portable mud slurry pump
February 4, 2014
0
Centrifuges – 330gpm @ 23% solids centrifuges (2) 660gpm’s
February 4, 2014
0
45% solids in holding area-dewatered to 55% before removal with loader after 2 hours setting time
February 4, 2014
0
Underflow from Cone bottom tank through slurry pump 0.6lbs polymer/dry ton-swelling clay
February 4, 2014
0
Slurry Pump at bottom of tank with discharge to containment area
February 4, 2014
0
Cone bottom tank with mud slurry going directly onto a dewatering screen. Water off the screen is returned to the front of the tank. 1250gpms @ 11% solids
February 4, 2014
0
Underflow solids from cyclone-50% solids and granular texture with SPC-929
February 4, 2014
0
Overflow from cyclone with addition of SPC-929 into unit-99% removal rate!
February 4, 2014
0
Overflow from Cyclone with no treatment
February 4, 2014
0
18″ Hydrocyclone running 750gpm’s at 10% solids; -325 to colloidal SPC-929 injected at entrance to hydrocyclone
February 4, 2014
0
Slogan
Text for button
Scroll